Despite the slight budget overage, the operational savings are projected to be significant.

During the stress testing of Prototype B, a voltage regulator failure occurred at 110% load. This was traced to a supplier defect in the capacitor bank. The issue was rectified in Prototype C by switching to a military-grade supplier. No further hardware failures were recorded in the final 300 hours of testing. dass127 new